Scheduled Construction And Road Closures For El Paso This Week
June is almost over but the construction all over El Paso is in full swing to get us to the finish line! Find out what major closures will be affecting your commute this week. Doesn’t matter when you’re traveling through the west side of El Paso, it looks like congestion is going to be an issue. Even the east side isn’t immune to traffic and headaches. With road closures, lane closures and more, El Paso traffic is getting worse before it gets any better. There will be some major freeway and road closures happening this week so make sure you are aware so you don’t get caught stuck in traffic.
Spall Repair Project
Sunday, June 23 - Thursday, June 27 (9 p.m.- 5 a.m.)
- Two right lanes I-10 westbound at Viscount overpass closed
- McRae on-ramp westbound closed
- Hawkins off-ramp westbound closed
Mesa Park Project
Mon., June 24 and Wed., June 26 (9 p.m. to 6 a.m. NIGHTLY)
- I-10 West COMPLETELY CLOSED from Schuster Exit to Sunland Park
Maintenance
Mon., June 24 - Fri., June 28 (9 a.m. to 3 p.m.)
- Left lane CLOSED US 85/Paisano BOTH DIRECTIONS between Spur 1966 and Doniphan
- I-10 West at Piedras entrance ramp CLOSED
- I-10 West at Cotton exit ramp CLOSED
- Left lane CLOSED at Missouri between Magnolia and Cotton
US 54 Widening and Illumination Project
Wed, June 26 (9 p.m. to 5 a.m.)
- Loop 375 South exit ramp CLOSED
I-10 West at Sunland
Wed, June 26 (9 p.m. to 6 a.m.)
- Main lanes of I-10 West COMPLETELY CLOSED between Sunland Park exit ramp and the North Mesa entrance ramp.
- Sunland Park westbound entrance ramp to the main lanes of I-10 West CLOSED
I-10 East at Mesa and I-10 West at Sunland
Thursday, June 27 (9 p.m. to 6 a.m.)
- Main lanes of I-10 East COMPLETELY CLOSED between the North Mesa exit ramp and the Sunland Park Drive overpass.
- Westbound CD lanes COMPLETELY CLOSED between the Sunland Park exit ramp and the Sunland Park entrance ramp.
- The US 85 westbound overpasses, which lead to the Sunland Park area, CLOSED at McNutt Road and at Racetrack Drive.
Go10 Project
Sunday, June 30 (3 a.m. to 6 a.m.)
- The main lanes of I-10 West COMPLETELY CLOSED between Executive Center Blvd (exit 16) and North Mesa.
- The Sunland Park entrance ramp to the main lanes of I-10 West CLOSED
- The Schuster/UTEP entrance ramp to I-10 West CLOSED
Paisano (US 85)
Fri, June 28 at 9 p.m.- Mon, June 30 at 5 a.m.
- Paisano Westbound at McNutt CLOSED
Doniphan
Sat, June 22 at 5 a.m. - Sun, June 23 at 6 p.m.
- Westbound left lane from US 85 to Racetrack CLOSED
Delta
Saturday, June 29 (6 a.m. to 6 p.m.)
- Coles St. to San Marcial St. Closed BOTH DIRECTIONS
Racetrack Dr
Fri, June 28 at 9 p.m.- Mon, June 30 at 5 a.m.
- Racetrack Entrance Ramp CLOSED
I-10 Connect Project
Mon, June 24 (7 p.m. to 6 a.m.)
- US 62 (Paisano Drive) between Gateway Boulevard North and Gateway Boulevard South COMPLETELY CLOSED
- Ramp V which connects southbound US 54 to Paisano Drive CLOSED
Tues, June 25 and Wed, June 26 (7 p.m. - 6 a.m.)
- Gateway Boulevard North between US 62 (Paisano Drive) and SH 20 (Alameda Avenue) COMPLETELY CLOSED
Thursday, June 27 (7 p.m.- 6 a.m.)
- Gateway Boulevard North between US 62 (Paisano Drive) and SH 20 (Alameda Avenue CLOSED
- Ramp V which connects southbound US 54 to US 62 (Paisano Drive) CLOSED
Mall Braided Ramps Project
Sun, June 23 - Fri, June 28 (9 p.m. to 5 a.m. NIGHTLY)
- I-10 West right lane CLOSED between Viscount Boulevard and Hawkins Boulevard
- Hawkins Boulevard exit ramp closed
Please follow the detour signs in place on all projects. All work is dependent upon weather conditions. Please follow the detour signs in place on all projects. All work is dependent upon weather conditions. Find out more information at the Texas Department of Transportation website. You can also follow the Go 10 Project on their website.