Road Closures For East El Paso This Week
El Paso is having road construction all over the city. Find out where, when and what hours Eastside streets will have construction this week.
The City of El Paso is working hard to make the streets better and easier for people to travel on in the future. Unfortunately, this means for the next few months and maybe years we will be dealing with more traffic than normal on various sides of town.
Please follow the detour signs in place on all projects. All work is dependent upon weather conditions.
Here are the road closures and lane restrictions for this week, December 12th through December 18th:
I-10 Americas Interchange – Phase III Project
Friday, Dec. 2, through Friday, Dec. 9
7 p.m. to 5 a.m. (complete closures)
- Joe Battle (Loop 375) southbound between Pellicano overpass to Americas interchange to include westbound connector ramp
- Americas (Loop 375) northbound between North Loop overpass and Americas interchange overpass to include westbound connector ramp
- I-10 westbound between the west to northbound connector ramp and Americas interchange
- Gateway East between Americas exit ramp and Eastlake exit ramp
- Americas Avenue northbound between Americas entrance ramp to Gateway East
- I-10 eastbound between the east to southbound connector ramp and Americas interchange
- Gateway West lanes between Eastlake Drive and RV Drive will be closed.
Joe Battle (Loop 375) Widening Project
Monday through Friday
7 a.m. to 4 p.m. (at different times throughout the day and at different locations)
- Alternate north and southbound entrance and exit ramp closures along Joe Battle (Loop 375) between the Bob Hope overpass and the Montana overpass
- Alternate north and southbound right and left lane closures along Joe Battle Boulevard between the Montana overpass and the Bob Hope overpass
- Alternate north and southbound turnaround closures along Joe Battle Boulevard between the Bob Hope overpass and the Montana overpass
Monday through Friday
9 a.m. to 4 p.m. (at different times throughout the day and at different locations)
- North and southbound right lane closure on Joe Battle (Loop 375) between the Bob Hope overpass and the Montana Overpass
El Paso East Side Projects
Carolina Bridge Project (until further notice)
- Carolina Bridge is closed between Stiles Drive/Franklin Drive and Alameda Avenue (SH 20).
Crews have demolished the existing bridge, and the reconstruction of the new bridge has begun.
North Loop (FM 76) Project
Starting Monday, Dec. 12, at 9 a.m. until further notice, Moon Road will be closed between North Loop Road (FM 76) and India Court.
Monday, Dec. 12, through Friday, Dec. 16
9 a.m. to 3 p.m. as needed
- Stedham Circle at North Loop Road (FM 76)
- Poona Drive at North Loop Road (FM 76)
- Delhi Drive at North Loop Road (FM 76)
Crews will install new water mains. Please use alternate routes.
Monday through Friday
9 a.m. to 3 p.m. (daily operation until further notice)
- Daily alternate lane closures at the North Loop/Rio Vista Boulevard intersection
Crews are placing hot mix and concrete paving, traffic signals, and drainage, as well as sidewalks, illumination and water mains.
The following closures will remain in place until further notice:
- East and westbound shoulders along North Loop Road between Americas Avenue and Horizon Boulevard
- North Loop (FM 76) east and westbound traffic has been placed onto the newly constructed pavement with one lane opened in each direction between Rio Vista Road and Lark Street.
The following streets will remain closed until further notice:
- Stedham Circle (westbound), Moon Road (northbound), Gurdev Circle (east) and Los Robles Drive
Closures are necessary for subgrade work, hot mix, and concrete paving for westbound lane of North Loop Road (FM 76).
Find more information on the road closures in El Paso area on the Texas Department of Transportation website.