Here are the road closures and lane restrictions for this week, January 9th through January 15th:

Border West Expressway Project

Paisano Drive (US 85)
Friday, Jan. 6
9 a.m. to noon (daytime closure)

  • Westbound right lane from Spur 1966 to Ruhlen Court

Closure is to move equipment.

Friday, Jan. 6, to Friday, Jan. 13
7 p.m. to 5 a.m. (nightly closure)

  • Eastbound right lane from Park Street to Coles Street

Closure is needed to relocate gas lines.

Friday, Jan. 13, to Monday, Jan. 16
9 p.m. to 5 a.m. (continuous full closure)

  • Westbound and eastbound from San Francisco to Spur 1966

Closure is to relocate a gas line.

Loop 375
Tuesday, Jan. 17, to Wednesday, Jan. 18
9 p.m. to 5 a.m. (nightly full closure)

  • Westbound from US 54 to Park Street

This closure is to install an overhead-sign board structure.

Tuesday, Jan. 24, to Wednesday, Jan. 25
9 p.m. to 5 a.m. (nightly full closure)

  • Westbound from US 54 to Park Street

This closure is to install an overhead-sign board structure.

El Paso West Area Projects

Bridge Preventative Repair Project
Monday, Jan. 9, through Friday, Jan. 13
7 a.m. to 4 p.m. (throughout the day)

  • Alternate lane closure on Cotton Street north and southbound between Missouri Avenue and Texas Street
  • Alternate lane closure on Franklin Avenue north and southbound between Main Drive and Coldwell Street
  • Alternate lane closure on Copia Street north and southbound between Gateway West and Gateway East, to include the turnaround
  • Right shoulder closure on I-10 east and westbound between Chelsea Street and Copia Street

Crews will be patching the I-10 bridge caps and columns.

Guardrail Repair Project
Monday, Jan. 9, through Friday, Jan. 13
9 a.m. to 3 p.m. (throughout the day)

  • Alternate lane closure on I-10 east and westbound between Anthony Avenue and Sunland Park Drive
  • Alternate lane closure on Transmountain (Loop 375) east and westbound between US 54 and I-10
  • Alternate lane closure on US 54 north and southbound between Hondo Pass Drive and Woodrow Bean/Transmountain (Loop 375)
  • Right lane closure on Cesar Chavez Border Highway (Loop 375) westbound between US 54 and Yarbrough Drive
  • Shoulder work closure on Talbot Avenue eastbound between Burns Street and Third Street
  • Right lane closure on US 54 southbound at Ramp D (Trowbridge to I-10)

Crews will be repairing damaged guardrail in the area.

Maintenance
Monday, Jan. 9
9 a.m. to noon

  • North and southbound Schuster underpass will be closed.
  • Eastbound Schuster exit ramp will be closed.
  • Westbound Piedras entrance ramp will be closed.

Monday, Jan. 9, through Friday, Jan. 13

9 a.m. to 3 p.m. (throughout the day)

  • Left lane closure on Transmountain between Gateway South and Plexxar Drive

Aesthetics Project - Phase III
Monday, Jan. 9, through Friday, Jan. 13
9 a.m. to 4 p.m.

  • Alternate left and right lane closures on Gateway East between Copia Street and Raynolds Street
  • Alternate left and right lane closures on Gateway West between Chelsea Street and Raynolds Street

Crews will be working on the aesthetic towers.

Dyer (BU 54) Mill/Inlay Project
Monday, Jan. 9, through Friday, Jan. 13
9 a.m. to 4 p.m. (throughout the day)

  • Alternate shoulder closures on Dyer between Tiger Eye (mile marker 32) to Ashley Street (mile marker 34.5)

Note: Expect alternate complete lane closures in both directions; traffic will be allowed to flow through with flaggers in place. Reduce speed and watch for flaggers directing traffic. Expect delays.

Crews are milling.

Paisano Landscaping Project
Monday, Jan. 9, through Friday, Jan. 13
9 a.m. to 4 p.m.

  • Alternate east and westbound lane closures on Paisano (US 62) between Eucalyptus Street and Montana Avenue

Rehabilitation/Operational Improvements Project
Monday, Jan. 9, through Friday, Jan. 13
9 a.m. to 4 p.m.

  • Alternate lane closure on I-10 east and westbound between David Road and Vinton overpass

Crews are working on share path.

Tom Mays Park Entrance Project
Monday, Jan. 9, through Saturday, Jan. 14
9 a.m. to 4 p.m.

  • Alternate east and westbound lane closures on Transmountain (Loop 375) between Paseo Del Norte and the Main Gap (mile marker 17)

Crews are working on the share path crossing for this project.

For more information on El Paso area road closures please see the Texas Department of Transportation website.