El Paso is having road construction all over the city. Find out where, when and what hours Eastside streets will have construction this week.

The City of El Paso is working hard to make the streets better and easier for people to travel on in the future. Unfortunately, this means for the next few months and maybe years we will be dealing with more traffic than normal on various sides of town.

Please follow the detour signs in place on all projects. All work is dependent upon weather conditions.

Here are the road closures and lane restrictions for this week, September 26th through October 2nd:

M F Aguilera Project

  • Monday through Friday
    6 a.m. to 7 p.m. (daily operation until further notice)
    East and westbound mainlane closure on Alameda Avenue (SH 20) between Manuel F. Aguilera Highway and Valle Verde Drive
    Note: Alameda Avenue (SH 20) east and westbound shoulders between M F Aguilera (southbound) and Valle Verde remain closed until further notice.
  • Monday, Oct. 3, through Friday, Oct. 21
    North and southbound lanes on O T Smith Road (FM 3380) will be completely closed between I-10 and Valley Gin Road.
    Pothole Project
  • Monday, Sept. 26, through Friday, Sept. 30
    9 a.m. to 3 p.m.
    Eastbound right lane closure on Alameda Avenue (SH 20) at Prado Road
    Crews will be repairing potholes.

North Loop (FM 76) Project

  • Monday, Sept. 26, through Friday, Sept. 30
    9 a.m. to 3 p.m. as needed
    Stedham Circle at North Loop Road (FM 76)
    Poona Drive at North Loop Road (FM 76)
    Gurdev Circle at North Loop Road (FM 76)
    Los Robles Avenue at North Loop Road (FM 76)
    Crews will install new water mains. Please use alternate routes.
  • Monday through Friday
    9 a.m. to 3 p.m. (daily operation until further notice)
    Daily alternate lane closures at the North Loop/Rio Vista Boulevard intersection
    Crews are placing hot mix and concrete paving, traffic signals, and drainage, as well as sidewalks, illumination and water mains.
    The following closures will remain in place until further notice:
    East and westbound shoulders along North Loop Road between Americas Avenue and Horizon Boulevard
    Old Hueco Tanks Road between North Loop Road (FM 76) and Stedham Circle
    North Loop (FM 76) east and westbound traffic has been placed onto the newly constructed pavement with one lane opened in each direction between Rio Vista Road and Lark Street.
    Old Hueco Tanks Road northbound between North Loop Road and Karachi Way is now completely closed while crews install a new water main.
  • The following streets will remain closed until further notice:
    Stedham Circle (westbound)
    Hesse Drive
    Rhutan Drive
    Moon Road (northbound)
    Punjab Drive
    Closures are necessary for subgrade work, hot mix, and concrete paving for westbound lane of North Loop Road (FM 76)

.Bridge Rail Project

  • Monday, Sept. 26, through Friday, Sept. 30
    9 a.m. to 4 p.m.
    Northbound right lane closure on Joe Battle Boulevard between Paseo Del Este Boulevard and Bob Hope Drive
    Right lane closure on Gateway South at the McCombs/US 54 intersection
    Southbound right lane closure on McCombs (FM 2529) at Gateway South
    Right lane closure on Gateway South at McCombs Drive (FM 2529)
    Crews will be installing metal beam guardrail.

Shoulder Work Project

  • Monday, Sept. 26, through Friday, Sept. 30
    9 a.m. to 4 p.m.
    Westbound right lane closure on Montana Avenue (US 62/180) between Tierra Este Boulevard and Joe Battle Boulevard
    Daily operation until further notice:
    North and southbound closure of the Iron Medics entrance ramps along the Purple Heart Memorial Highway (Loop 375)

Maintenance Project

  • Monday through Friday (daily operation until further notice)
    9 a.m. to 4 p.m.
    South and northbound alternate left and right lane closures on Joe Battle Boulevard between Montana Avenue (US 62/180) and Rojas Drive
    All entrance and exit ramps along this same section will be closed.
    Crews will be sweeping and removing litter from this area.

Carolina Bridge Project

  • Carolina Bridge is closed between Stiles Drive/Franklin Drive and Alameda Avenue (SH 20) until further notice.
    Crews have demolished the existing bridge, and the reconstruction of the new bridge has begun.

Deceleration Lane/Driveway Project (NOTE: This is not a TxDOT project.)

  • Expect these closures every Monday through Friday until further notice:
    9 a.m. to 4 p.m. (at different times throughout the day)
    Southbound right lane closure on Joe Battle Boulevard at Edgemere Blvd
    Northbound right lane closure on Zaragoza Boulevard (FM 659) at Sun Fire Blvd
    Southbound right lane closure on Zaragoza Boulevard at Tierra Este Blvd
    Eastbound right lane closure on Montana Ave at Tierra Este Blvd/Justice
    Southbound right lane closure on Zaragoza Blvd (FM 659) at Edgemere Blvd
    Westbound right lane closure on Montana Ave (US 62/180) at Rich Beam Blvd
    Eastbound right lane closure on Montana Ave between Tierra Este Blvd and Rich Beam Blvd
  • Monday through Friday
    7 a.m. to 4 p.m. (at different times throughout the day and at different locations)
    Alternate north and southbound entrance and exit ramp closures along Joe Battle (Loop 375) between the Bob Hope overpass and the Montana Overpass
    Alternate north and southbound right and left lane closures along Joe Battle Boulevard between the Montana overpass and the Bob Hope overpass
    Alternate north and southbound turnaround closures along Joe Battle Boulevard between the Bob Hope overpass and the Montana overpass
  • Monday through Friday
    9 a.m. to 4 p.m. (at different times throughout the day and at different locations)
    North and southbound right lane closure on Joe Battle (Loop 375) between the Bob Hope overpass and the Montana Overpass
    These closures are necessary for guardrail and electrical work.

I-10 Americas Interchange - Phase III

  • Friday, Sept. 23, through Friday, Sept. 30
    7 p.m. to 5 a.m. (the following morning)
    Complete closures (at different times and at different locations):
    Joe Battle (Loop 375) southbound between the south to westbound connector ramp and Americas interchange
    Americas (Loop 375) northbound between the north to westbound connector ramp and Americas interchange
    I-10 westbound between the west to northbound connector ramp and Americas interchange
    Gateway East between Americas exit ramp and Eastlake exit ram
    Americas Avenue northbound between Americas entrance ramp to Gateway East
    I-10 eastbound between the east to southbound connector ramp and Americas interchange
    Gateway West lanes between Eastlake Drive and RV Drive will be closed.
    Crews will be doing bridge work.
    Please follow the detour signs in place on all projects.
    All work is dependent upon weather conditions.

East Area Operational Improvements

  • Monday through Friday
    9 a.m. to 4 p.m. (at different times throughout the day and at different locations)
    I-10 west and eastbound right shoulder closures between the Zaragoza overpass and Viscount/Hunter overpass
    I-10 east and westbound left shoulder closures between the Viscount/Hunter overpass and the Zaragoza overpass
    Alternate right and left lane closures along Gateway West and Gateway East between the Viscount/Hunter intersections and Zaragoza intersection
    I-10 east and westbound alternate entrance and exit ramps will be closed between the Viscount/Hunter intersections and Zaragoza intersection.

More From KLAQ El Paso