El Paso is having road construction all over the city. Find out where, when and what hours Eastside streets will have construction this week.

The City of El Paso is working hard to make the streets better and easier for people to travel on in the future. Unfortunately, this means for the next few months and maybe years we will be dealing with more traffic than normal on various sides of town.

Please follow the detour signs in place on all projects. All work is dependent upon weather conditions.

Here are the road closures and lane restrictions for this week, October 3rd through October 9th:

M F Aguilera Project
Monday through Friday
6 a.m. to 7 p.m. (daily operation until further notice)

  • East and westbound mainlane closure on Alameda Avenue (SH 20) between Manuel F. Aguilera Highway and Valle Verde Drive

Note: Alameda Avenue (SH 20) east and westbound shoulders between M F Aguilera (southbound) and Valle Verde remain closed until further notice.

Monday, Oct. 3, through Friday, Oct. 21 (continuous closure)

  • North and southbound lanes on O T Smith Road (FM 3380) will be completely closed between I-10 and Valley Gin Road.

Pothole Project
Monday, Oct. 3, through Friday, Oct. 7
9 a.m. to 3 p.m.

  • Eastbound right lane closure on Alameda Avenue (SH 20) at Prado Road

Crews will be repairing potholes.

Striping Project
Sunday, Oct. 2, through Friday, Oct. 7 (moving operation)
9 p.m. to 6 a.m.

  • East and westbound lane closures on Alameda Avenue (SH 20) between Americas Avenue and Clint Road (FM 1110)

Monday, Oct. 3, through Friday, Oct. 7 (moving operation)
9 a.m. to 4 p.m.

  • North and southbound lane closures on Clint Road (FM 1110) between I-10 to Socorro Road (FM 258)

Crews will be striping roadways.

North Loop (FM 76) Project
Monday, Oct. 3, through Friday, Oct. 14 (continuous closure)

  • Rio Vista Road northbound will be completely closed between North Loop Road (FM 76) and Kirkland Street.

Monday, Oct. 3, through Friday, Oct. 7
9 a.m. to 3 p.m. (as needed)

  • Stedham Circle at North Loop Road (FM 76)
  • Poona Drive at North Loop Road (FM 76)
  • Gurdev Circle at North Loop Road (FM 76)
  • Los Robles Avenue at North Loop Road (FM 76)

Crews will install new water mains. Please use alternate routes.
Monday through Friday
9 a.m. to 3 p.m. (daily operation until further notice)

  • Daily alternate lane closures at the North Loop/Rio Vista Boulevard intersection

Crews are placing hot mix and concrete paving, traffic signals, and drainage, as well as sidewalks, illumination and water mains.
The following closures will remain in place until further notice:

  • East and westbound shoulders along North Loop Road between Americas Avenue and Horizon Boulevard
  • North Loop (FM 76) east and westbound traffic has been placed onto the newly constructed pavement with one lane opened in each direction between Rio Vista Road and Lark Street.

The following streets will remain closed until further notice:

  • Stedham Circle (westbound), Hesse Drive, Rhutan Drive, Moon Road (northbound), and Punjab Drive

Closures are necessary for subgrade work, hot mix, and concrete paving on the westbound lane of North Loop Road (FM 76).

Bridge Rail Project
Monday, Oct. 3, through Friday, Oct. 7
9 a.m. to 4 p.m.

  • Northbound right lane closure on Joe Battle Boulevard between Paseo Del Este Boulevard and Bob Hope Drive
  • Right lane closure on Gateway South at the McCombs/US 54 intersection
  • Southbound right lane closure on McCombs (FM 2529) at Gateway South
  • Right lane closure on Gateway South at McCombs Drive (FM 2529)

Crews will be installing metal beam guardrail.

Shoulder Work Project
Monday, Oct. 3, through Friday, Oct. 7
9 a.m. to 4 p.m.

  • Westbound right lane closure on Montana Avenue (US 62/180) between Tierra Este Boulevard and Joe Battle Boulevard

Daily operation until further notice:

  • North and southbound closure of the Iron Medics entrance ramps along the Purple Heart Memorial Highway (Loop 375)

Maintenance Project
Monday through Friday (daily operation until further notice)
9 a.m. to 4 p.m.

  • South and northbound alternate left and right lane closures on Joe Battle Boulevard between Montana Avenue (US 62/180) and Rojas Drive
  • All entrance and exit ramps along this same section will be closed.

Crews will be sweeping and removing litter from this area.

Carolina Bridge Project

  • Carolina Bridge is closed between Stiles Drive/Franklin Drive and Alameda Avenue (SH 20) until further notice.

Crews have demolished the existing bridge, and the reconstruction of the new bridge has begun.

Deceleration Lane/Driveway Project (NOTE: This is not a TxDOT project.)
Expect these closures every Monday through Friday until further notice:
9 a.m. to 4 p.m. (at different times throughout the day)

  • Southbound right lane closure on Joe Battle Boulevard at Edgemere Boulevard
  • Northbound right lane closure on Zaragoza Boulevard (FM 659) at Sun Fire Boulevard
  • Southbound right lane closure on Zaragoza Boulevard (FM 659) at Tierra Este Boulevard
  • Eastbound right lane closure on Montana Avenue (US 62/180) at Tierra Este Boulevard/Justice
  • Southbound right lane closure on Zaragoza Boulevard (FM 659) at Edgemere Boulevard
  • Westbound right lane closure on Montana Avenue (US 62/180) at Rich Beam Boulevard
  • Eastbound right lane closure on Montana Avenue (US 62/180) between Tierra Este Boulevard and Rich Beam Boulevard

East Area Operational Improvements
Monday through Friday
9 a.m. to 4 p.m. (at different times throughout the day and at different locations)

    • I-10 west and eastbound right shoulder closures between the Zaragoza overpass and Viscount/Hunter overpass
    • I-10 east and westbound left shoulder closures between the Viscount/Hunter overpass and the Zaragoza overpass
    • Alternate right and left lane closures along Gateway West and Gateway East between the Viscount/Hunter intersections and Zaragoza intersection
    • I-10 east and westbound alternate entrance and exit ramps will be closed between the Viscount/Hunter intersections and Zaragoza intersection.

I-10 Americas Interchange
Friday, Sept. 30, through Friday, Oct. 7
7 p.m. to 5 a.m.
Complete closures (at different times and at different locations):

  • Joe Battle (Loop 375) southbound between the south to westbound connector ramp and Americas interchange
  • Americas (Loop 375) northbound between the north to westbound connector ramp and Americas interchange
  • I-10 westbound between the west to northbound connector ramp and Americas interchange
  • Gateway East between Americas exit ramp and Eastlake exit ramp
  • Americas Avenue northbound between Americas entrance ramp to Gateway East
  • I-10 eastbound between the east to southbound connector ramp and Americas interchange
  • Gateway West lanes between Eastlake Drive and RV Drive will be closed.

Monday through Friday

7 a.m. to 4 p.m. (at different times throughout the day and at different locations)

    • Alternate north and southbound entrance and exit ramp closures along Joe Battle (Loop 375) between the Bob Hope overpass and the Montana overpass
    • Alternate north and southbound right and left lane closures along Joe Battle Boulevard between the Montana overpass and the Bob Hope overpass
    • Alternate north and southbound turnaround closures along Joe Battle Boulevard between the Bob Hope overpass and the Montana overpass

Loop 375 (Joe Battle) Widening Project
Monday through Friday
9 a.m. to 4 p.m. (at different times throughout the day and at different locations)

      • North and southbound right lane closure on Joe Battle (Loop 375) between the Bob Hope overpass and the Montana overpass

These closures are necessary for guardrail and electrical work.

More From KLAQ El Paso